欧美日韩精品久久久免费…|久久精品综合欧美日韩久久|区三区中文字幕,日韩国产|中日韩欧美一区二区三区在线

服務(wù)熱線電話

400-6188-756

cnc高壓清洗機(jī)在使用前要注意什么?

來(lái)源:http://m.ishihara2010.com/ 時(shí)間: 2022-12-21 瀏覽次數(shù): 0

1、開(kāi)機(jī)前的準(zhǔn)備:開(kāi)機(jī)前查看清洗機(jī)各部位螺釘、螺母是否有松動(dòng)現(xiàn)象,泵偏疼軸箱內(nèi)已加入30#或40#機(jī)油,需查看油位(正好漫過(guò)油鏡為益);
1. Preparation before starting up: Before starting up, check whether the screws and nuts at each part of the washer are loose. The pump is fond of adding 30 # or 40 # engine oil into the axle box, and check the oil level (it is beneficial to just overflow the oil mirror);
2、進(jìn)水管連接:將進(jìn)水膠管套在泵體的進(jìn)水口接頭上,然后套上喉卡,擰緊喉卡上的螺釘,保證連接牢固且不漏氣。然后按水源的情況將另一端套在自來(lái)水上或放入供水池中(進(jìn)水口必須浸入水中),進(jìn)水管要求安裝過(guò)濾器,以免吸入的雜質(zhì)損壞高壓泵;
2. Water inlet pipe connection: put the water inlet rubber pipe on the water inlet joint of the pump body, then put on the throat clamp, and tighten the screw on the throat clamp to ensure that the connection is firm and air tight. The other end shall be sleeved on the tap water or put into the water supply pool according to the water source condition (the water inlet must be immersed in water). The inlet pipe shall be equipped with a filter to prevent the impurities inhaled from damaging the high-pressure pump;
3、出水管連接:把高壓膠管的刺進(jìn)接頭端與機(jī)具出水口上的快換接頭相連;另一端與噴閥上的螺紋接頭相連。接法參見(jiàn)結(jié)構(gòu)圖(快換接頭的接法:只要把滾花套筒向后推,再把接頭往里推平即可)。注意:高壓水管不能絞結(jié),盡量延展、拉直;
CNC高壓清洗機(jī)
3. Water outlet pipe connection: connect the piercing connector end of the high-pressure rubber pipe with the quick change connector on the water outlet of the machine tool; The other end is connected with the threaded joint on the spray valve. Refer to the structure drawing for connection method (connection method of quick change connector: just push the knurled sleeve backward and then push the connector inward). Note: High pressure water pipe shall not be twisted, and shall be stretched and straightened as far as possible;
4、電源連接:要確定電源電壓與標(biāo)牌規(guī)則相一致,清洗機(jī)所采用的固定電源的連接應(yīng)由人員進(jìn)行,并應(yīng)符合GB/T16895的要求。如果使用延伸電源線,插頭和插座應(yīng)是防水結(jié)構(gòu)的。連接插座時(shí),必須將清洗機(jī)的開(kāi)關(guān)定在“關(guān)”的位置;
4. Power connection: make sure that the power supply voltage is consistent with the label rules. The connection of the fixed power supply used by the cleaning machine should be carried out by personnel and should meet the requirements of GB/T16895. If the extended power cord is used, the plug and socket shall be of waterproof structure. When connecting the socket, the switch of the cleaning machine must be set at the "off" position;
5、可更換式噴頭:本機(jī)噴桿可通過(guò)更換噴頭調(diào)節(jié)噴出水流,短噴頭為圓孔束狀水流,長(zhǎng)桿為扇形水流;
5. Replaceable sprinkler head: the spray bar of this machine can adjust the water flow by changing the sprinkler head. The short sprinkler head is circular hole bundle water flow, and the long rod is fan water flow;
圓孔束狀水流:該噴頭能產(chǎn)生束狀強(qiáng)力射流,用于污垢特別嚴(yán)重的外表。如農(nóng)業(yè)機(jī)械、建筑機(jī)械等;
Round hole bundle water flow: the nozzle can produce bundle shaped strong jet, which is used for the appearance of especially serious dirt. Such as agricultural machinery, construction machinery, etc;
扇形水流:該噴頭產(chǎn)生扇形射流,散射角大,對(duì)被清洗物體的沖擊力小,能用于大面積污垢外表的清洗,如轎車、公共汽車、卡車、拖接機(jī)和其它各種車輛、船舶;菜場(chǎng)及食品加工場(chǎng),賓館廚房;澡堂、游泳池;畜舍及畜牧柵欄,高層建筑的外墻清洗等;
Fan shaped water flow: the nozzle produces a fan shaped jet with large scattering angle and small impact on the object to be cleaned, which can be used to clean the surface of large areas of dirt, such as cars, buses, trucks, tractors and other vehicles and ships; Vegetable and food processing farms, hotel kitchens; Bathrooms and swimming pools; Livestock houses and stockbreeding fences, cleaning of external walls of high-rise buildings, etc;
6、啟動(dòng)機(jī)器:查看進(jìn)水管與出水高壓管已經(jīng)連接可靠,電源插座接好,可以接通電源,扣動(dòng)噴桿的拉手,待機(jī)具內(nèi)的空氣排凈后,即可有高壓水噴出。使用時(shí),空氣排放較慢,可先將出水高壓管取下,待出水接頭處有水噴出已無(wú)氣體時(shí)關(guān)機(jī),由快速接頭處接上高壓管,再重新開(kāi)機(jī)使用。
6. Start the machine: check that the water inlet pipe and the water outlet high-pressure pipe have been connected reliably, the power can be connected after the power socket is connected, the handle of the spray bar can be pulled, and high-pressure water can be sprayed out after the air in the tool is completely discharged. When in use, the air discharge is slow. Take down the high pressure water outlet pipe first. When there is water at the outlet connector and there is no gas, shut down the machine. Connect the high pressure pipe at the quick connector and restart the machine for use.
濟(jì)南科爾超聲波設(shè)備有限公司專注生產(chǎn)CNC高壓清洗機(jī),更多的關(guān)于通風(fēng)管道中的消息,請(qǐng)點(diǎn)擊我們的網(wǎng)站http://m.ishihara2010.com查看,我們會(huì)有更多精彩內(nèi)容等您查看.
Jinan Keer Ultrasonic Equipment Co., Ltd. focuses on the production of CNC high-pressure cleaning machines. For more information about ventilation ducts, please click our website http://m.ishihara2010.com Check, we will have more wonderful content for you to check

聯(lián)系我們

詹老師:18663767799(微信同號(hào))

陶老師:13011716033(微信同號(hào))

張老師:18663767790(微信同號(hào))

:1476171179/1500705758

[email protected]

:地址:山東省濟(jì)南市濟(jì)陽(yáng)區(qū)創(chuàng)業(yè)路與啟航街交叉口南40米

關(guān)注科爾

  • 掃一掃了解更多

  • 掃一掃了解更多

備案號(hào):魯ICP備18049717號(hào)-1  魯公網(wǎng)安備37011202000628號(hào)